TUZLUKÇU GES

TUZLUKÇU GES

* AEM, BSM, MAKASCI MÜHENDİSLİK GES PROJELERİ
* Lokasyon : Pazarkaya, Tuzlukçu, Konya
* Toplam DC Güç: 5.173,40 kWp
* Güneş Paneli: 7.320 Adet CSUN 245-60P (245 Wp), 13.520 Adet HANWHA HSL60S Poly (250 Wp) 
* Evirici (Inverter): 35 inverteres SMA SMC 11000TLRP (11 KW), 114 Adet SMA STP25000TL-30 (25 KW)
* Hesaplanan Yıllık Üretim: 8.525.000 kWh
* Yapım Yılı: 2015
 